The 2nd floor exterior walls get built next
The 2nd floor exterior walls get built next
The living room roof gets framed . . .
The living room roof gets framed . . .
. . . until all trusses are in place.
. . . until all trusses are in place.
This cathedral ceiling reaches about 11 feet
This cathedral ceiling reaches about 11 feet
You start to pick up the exterior house "shape"
You start to pick up the exterior house "shape"
The girls' bathroom and bedroom windows
The girls' bathroom and bedroom windows
Working on Rachel's and Carly's exterior walls
Working on Rachel's and Carly's exterior walls
We'll need to open up that window later
We'll need to open up that window later
Their inside walls go up too
Their inside walls go up too
See where Bill's left hand is? . . .
See where Bill's left hand is? . . .
. . . That's where Bill nail-gunned Mike in the palm
. . . That's where Bill nail-gunned Mike in the palm
The girls' rooms are framed
The girls' rooms are framed
The hole in the floor has been repaired
The hole in the floor has been repaired
Master bedroom exterior walls go up
Master bedroom exterior walls go up
Laying out the master bedroom area
Laying out the master bedroom area
Building the master bedroom
Building the master bedroom