"Be the trowel"
|
Smoothing the slab
|
The slab is cured
|
Sawing the expansion joint
|
Widening the pier holes
|
Talking with Steve, our framing supervisor
|
First steel goes in
|
The long beam is prepped for install
|
Rolling out the 2x10 joists
|
Steve readies a dining room joist
|
Almost ready for the subfloor
|
This will be the fireplace
|
The staircase will go here
|
Glueing and nailing the 3/4" OSB subfloor
|
The basement from beneath the family room
|
The 3/4" OSB fully covers the basement
|
The fully enclosed basement
|