Basement plumbing is roughed-in
|
Here's to "no leaks"!
|
The sump awaits its inspection
|
The gravel arrives
|
Four big piles, waiting for backfill
|
This steel will help support the 1st floor.
|
Warning: objects in mirror may be closer than they appear.
|
Installing exterior drain tile
|
Tile installed and awaiting backfill
|
The guy on the bulldozer gets to work.
|
Gravel goes in . . .
|
. . . on top of the drain tile first.
|
Dirt goes in on top of the gravel to complete the backfill.
|
The garage interior gets a full bed of gravel.
|
The garage exterior is backfilled with just dirt.
|
All backfilled and awaiting slab gravel.
|
Doh! These bolts will have to be replaced.
|
The basement is ready for the slab.
|
Land is graded
|
Dead trees ready for construction
|
Is this moisture barrier out of place?
|
Rachel Dickson, almost 12
|
Rachel and me
|
Carly Dickson, almost 10
|
Carly and me
|
While I geek out with truss drawings . . .
|
. . . Carly and Rachel play atop Dirt McHill.
|
Losing control while running downhill
|
We're standing on our rooms!
|
Yes, this is heavy.
|
The explorers risk the rickety ladder.
|
Checking out the unfinished basement
|